<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Selective Demolition | Simcat Group Melbourne</title>
	<atom:link href="https://simcatgroup.com.au/tag/selective-demolition-melbourne/feed/" rel="self" type="application/rss+xml" />
	<link>https://simcatgroup.com.au</link>
	<description>Demolition Specialists</description>
	<lastBuildDate>Tue, 29 Sep 2026 04:06:40 +0000</lastBuildDate>
	<language>en-AU</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.1.4</generator>
	<item>
		<title>Fragmented Demolition Solutions: Do&#8217;s and Don&#8217;ts to Ensure Safe and Hassle-Free Projects</title>
		<link>https://simcatgroup.com.au/fragmented-demolition-solutions-dos-and-donts-to-ensure-safe-and-hassle-free-projects/</link>
		
		<dc:creator><![CDATA[Netwizard SEO]]></dc:creator>
		<pubDate>Fri, 05 Nov 2021 00:30:05 +0000</pubDate>
				<category><![CDATA[Blog]]></category>
		<category><![CDATA[Partial Demolition]]></category>
		<category><![CDATA[Selective Demolition]]></category>
		<guid isPermaLink="false">https://simcatgroup.com.au/?p=573</guid>

					<description><![CDATA[<p>Fragmented demolition projects should be easier to carry out than a full-on demolition. All things considered, there are fewer materials to break down and remove when the work calls for a fragmentedly rendered service, right? That is not necessarily true. [&#8230;]</p>
The post <a href="https://simcatgroup.com.au/fragmented-demolition-solutions-dos-and-donts-to-ensure-safe-and-hassle-free-projects/">Fragmented Demolition Solutions: Do’s and Don’ts to Ensure Safe and Hassle-Free Projects</a> first appeared on <a href="https://simcatgroup.com.au">Simcat Group Melbourne</a>.]]></description>
										<content:encoded><![CDATA[<p>Fragmented demolition projects should be easier to carry out than a full-on demolition. All things considered, there are fewer materials to break down and remove when the work calls for a fragmentedly rendered service, right? That is not necessarily true. Think of the actions that are being taken in this job. It’s a fragmented approach, and there’s an interface or buffer between the demolished section and the untouched region.</p>
<p><strong>What You Need to Know About Fragmented Demolition Projects?</strong></p>
<p>In this hypothetical project, one side of a structure has been entirely gutted. The opposing side is still functional and it will be renovated by a different contractor, maybe months from now. With walls and load-bearing pillars removed, the gutted section is being affected by the untouched structural elements. To counter those forces, the demolition service erects a series of wall buttressing supports. Without this temporary section buffering solution, the various-condition structural fragments could topple over or crumble.</p>
<p><strong>Compensating For Sectional Shortcomings </strong></p>
<p>In truth, this is a more complicated job. One part of a structure is disconnected according to one definition of a demolition contractor&#8217;s deconstruction handbook. Meanwhile, another section is classified as intact. The gas lines and electrical conduits cannot entirely be pulled, not yet at any rate. Fuses and circuit breakers need to be disconnected and labelled. In an entire demolition work, that whole switchboard would come out. In fragmented demolition work, it is easy to pull the wrong fuse, disconnect the wrong gas line, or isolate a service that’s still required in at least part of the building. The contractor might end up calling out an electrician, for someone needs to put in a temporary power supply until something more permanent solution can be done to safely split the various services.</p>
<p><strong>Sealing Failures Should Never Happen </strong></p>
<p>There will be an exposed wall filled with asbestos in the deconstructed section. It must be necessarily sealed off, so the vents to the other side of the edifice require attention. Rats and other vermin take up residence in the torn down sections. The building, fragmentedly demolished or not, needs to be boarded up and shuttered. Vermin traps should be laid. That’s an approach that applies to mould growths, rain and other environmental elements, and to the occasional homeless person who sees the demolished area as a temporary home.</p>
<p>Essentially, casual observers don’t have any trouble telling the difference between the fragmented sections of a demolished structure. What they do have trouble with is seeing the buffers between areas. Shuttered doorways and boarded-up passages are easy enough to install, but what about vents and structural elements? The vent system needs separating so that vermin and mould cannot spread. As for the structure, a temporary support system must be installed if any load-supporting walls or pillars are removed.</p>
<p>SIMCAT has established itself as a leader of the demolition works all over Melbourne, specialising in large and small demolition, domestic and commercial sites, asbestos and hazardous waste management. Our professional and experienced team members are all accredited with relevant industry certifications, providing a premium service to contractors and homeowners all over the Melbourne area.</p>The post <a href="https://simcatgroup.com.au/fragmented-demolition-solutions-dos-and-donts-to-ensure-safe-and-hassle-free-projects/">Fragmented Demolition Solutions: Do’s and Don’ts to Ensure Safe and Hassle-Free Projects</a> first appeared on <a href="https://simcatgroup.com.au">Simcat Group Melbourne</a>.]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>What is a Demolition Plan and How is it Used to Carry Out a Building Demolition?</title>
		<link>https://simcatgroup.com.au/what-is-a-demolition-plan-and-how-is-it-used-to-carry-out-a-building-demolition/</link>
		
		<dc:creator><![CDATA[Netwizard SEO]]></dc:creator>
		<pubDate>Wed, 21 Oct 2020 22:19:18 +0000</pubDate>
				<category><![CDATA[Blog]]></category>
		<category><![CDATA[Commercial Demolition]]></category>
		<category><![CDATA[Selective Demolition]]></category>
		<guid isPermaLink="false">https://simcatgroup.com.au/?p=521</guid>

					<description><![CDATA[<p>Demolition means dismantling, razing, destroying or wrecking any building or structure or any part of it by pre-planned and controlled methods. Based on demolition surveys, a demolition plan is prepared. This demolition plan is produced with the application for approval [&#8230;]</p>
The post <a href="https://simcatgroup.com.au/what-is-a-demolition-plan-and-how-is-it-used-to-carry-out-a-building-demolition/">What is a Demolition Plan and How is it Used to Carry Out a Building Demolition?</a> first appeared on <a href="https://simcatgroup.com.au">Simcat Group Melbourne</a>.]]></description>
										<content:encoded><![CDATA[<p>Demolition means dismantling, razing, destroying or wrecking any building or structure or any part of it by pre-planned and controlled methods. Based on demolition surveys, a demolition plan is prepared. This demolition plan is produced with the application for approval of demolition to the local authority. Demolition plan should include the following things, first a plan showing the location of a building to be demolished.</p>
<p>Then the building height, structural system, extent of damage to the building, existing structures and facilities in the vicinity, layout plan, proposed method of demolition, proposed shoring and precautionary measures for adjacent buildings, safety measures to be taken, proposed sequence of demolition steps, details of equipment’s used, a plan for handling and disposal of debris, proposed arrangements for site supervision.</p>
<p><strong>How Demolition Is Carried Out Of Building Using Demolition Plan ?</strong></p>
<p>First, a permission from local authority is taken for carryout demolition work. Second step is to carryout demolition survey and note all detail which are required for  demolition. Prepare demolition plan for building and include various thing that i have discuss above. Find out the location of demolition site. After allocation of site provide safety barrier. This safety barrier is provide for safety of adjoining structure from demolition. After proper  safety provision on  surrounding the site remove all the dead load from the building make it soft strip. After proper arrangement of blasting material controlled demolition is carried out on first building. After completion of demolition  first building, same way controlled demolition is carried out for second building. After demolition of building all debris material is removed from the site using hauling equipment and then foundation of building is remove and cleaning of site is done.</p>
<p><strong>Factors Affecting Demolition Plan</strong></p>
<p>In order to draw demolition plan first surveys are carried out for information collection. Below is an overview of the demolition plan and how it is used to carry out a building demolition. Here are the factors affecting in drawing demolition plan</p>
<p><strong><em>Type Of Structure</em></strong>: The demolition plan varies with type of structure. For demolition of  steel structure demolition plan will be different form reinforced concrete  structure.</p>
<p><strong><em>Size Of Structure</em></strong>: The demolition plan varies with size of structure . For demolition of small structure demolition plan will be different form large structures.</p>
<p><strong><em>Location Of Structure</em></strong>: In hilly area demolition plan will be different compare to demolition of structure in  marine area.</p>
<p><strong><em>Safety Required</em></strong>: Higher safety will required great attention in drawing of demolition plan.</p>
<p><strong><em>Limitation Of Noise, Dust And Vibration</em></strong>: Limitation of noise, dust and vibration affect methods of demolition and due to change in method of demolition , demolition  plan also change.</p>
<p><strong><em>Available Equipment</em></strong>: Available equipment also effect method of demolition so due to this  demolition plan also change</p>
<p><strong><em>Behaviour Of Structure</em></strong>: Behaviour of structure also change demolition plan.  Properties of steel structure is different compare to RCC structure or concrete structure that why both structure have different behaviour.</p>
<p>Source:</p>
<p>Brother, E. (n.d.). <em>What Is Demolition Plan ? And How Demolition Is Carried Out Of Building Using Demolition Plan ?</em> Retrieved October 16, 2020, from Engineering Brother: https://engineeringbrother.com/what-is-demolition-plan-and-how-demolition-is-carried-out-of-building-using-demolition-plan.html</p>
<p>&nbsp;</p>The post <a href="https://simcatgroup.com.au/what-is-a-demolition-plan-and-how-is-it-used-to-carry-out-a-building-demolition/">What is a Demolition Plan and How is it Used to Carry Out a Building Demolition?</a> first appeared on <a href="https://simcatgroup.com.au">Simcat Group Melbourne</a>.]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>House Demolition Planning and Cost Estimation Tips</title>
		<link>https://simcatgroup.com.au/house-demolition-planning-and-cost-estimation-tips/</link>
		
		<dc:creator><![CDATA[simcat]]></dc:creator>
		<pubDate>Tue, 07 Apr 2020 07:19:36 +0000</pubDate>
				<category><![CDATA[Blog]]></category>
		<category><![CDATA[Residential Demolition]]></category>
		<category><![CDATA[Selective Demolition]]></category>
		<guid isPermaLink="false">https://simcatgroup.com.au/?p=492</guid>

					<description><![CDATA[<p>Many are not aware that the decision-making process in house demolition is an extremely tedious process. There are so many things to consider and take into account. One of the first step in successfully undertaking a house demolition is a [&#8230;]</p>
The post <a href="https://simcatgroup.com.au/house-demolition-planning-and-cost-estimation-tips/">House Demolition Planning and Cost Estimation Tips</a> first appeared on <a href="https://simcatgroup.com.au">Simcat Group Melbourne</a>.]]></description>
										<content:encoded><![CDATA[<p>Many are not aware that the decision-making process in house demolition is an extremely tedious process. There are so many things to consider and take into account. One of the first step in successfully undertaking a house demolition is a coming up with a fool-proof plan and cost estimation. Below are house demolition planning and cost estimation tips.</p>
<p><strong>Obtain Regulatory Permits</strong></p>
<p>Planning and cost estimating of your house demolition is equally important. Obviously, you won&#8217;t be building the castle in a dream. To carry out the demolition process and cost estimation, you will obtain several permits and approvals from the government. A reliable house demolition company never lets you run from pillar to post to acquire the demolition permit. If there is a case of obtaining the permit for single family residence, then there are no charges involved in it. However, you&#8217;re required to pay the amount when there&#8217;s no existing building permit. The amount of demolition permit varies from state to state and it involves nominal fee.</p>
<p><strong>Adhere to Demolition Standards</strong></p>
<p>Generally the demolition standards are approved by government to ensure complete safety of environment and people associated with it. It also involves high standard service along with professionalism and flawless quality. The commercial demolition experts take care of clients like nobody else. The aim is to complete the projects on time and within budget.</p>
<p><strong>Follow Demolition Site Plan</strong></p>
<p>There is a need to hire the brilliant architects for preparing the site plan of your demolition house. The team of professional architects will require this site plan to carry out the demolition task. Which materials to be removed, from where they need to be removed, what are other building materials that need to be removed and what needs to be retained, everything should be mentioned in this site plan for the convenience.</p>
<p><strong>Complete the Project on Time</strong></p>
<p>Demolishing a house needs proper plan of action. Considering the residential and commercial areas, the purpose is to go for cost effective services. A good house demolition company ensures the completion of projects on time so that it doesn&#8217;t inflate the budget. There are other factors depending on which rates could be different. The cost estimate highly depend on the nature of the project, type of material removal, environmental safety, and number of workers involved.</p>
<p><strong>Hire Professional Demolition Contractors</strong></p>
<p>It is highly recommendable for people to hire a professional demolition contractor to move ahead with the demolition projects. Half information could be very harmful while demolishing the house and it can prove fatal for your environment as well. Hiring a demolition contractor is an easy, smooth and safe way to complete your imminent tasks within specific budget and timeline. An experienced demolition contractor acts a pillar of the strength and advice about making the right amendments at the right places keeping your budget in mind.</p>
<p>If you are looking for a reliable and professional demolition to carry out your home demolition project, look no further than Simcat Demolitions. We have a committed and hardworking team will remove everything to ensure you are set for the next phase of your project, while striving to create innovative solutions that safely and professionally enhance the quality of any project.</p>The post <a href="https://simcatgroup.com.au/house-demolition-planning-and-cost-estimation-tips/">House Demolition Planning and Cost Estimation Tips</a> first appeared on <a href="https://simcatgroup.com.au">Simcat Group Melbourne</a>.]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Pre-Demolition Audit: When Is It Necessary?</title>
		<link>https://simcatgroup.com.au/pre-demolition-audit-when-is-it-necessary/</link>
		
		<dc:creator><![CDATA[Netwizard SEO]]></dc:creator>
		<pubDate>Tue, 03 Sep 2019 02:22:03 +0000</pubDate>
				<category><![CDATA[Blog]]></category>
		<category><![CDATA[Selective Demolition]]></category>
		<guid isPermaLink="false">https://simcatgroup.com.au/?p=455</guid>

					<description><![CDATA[<p>A pre-demolition audit allows professionals to assess the non-hazardous materials that require removal from the structure and calculate their potential value. Some of these materials may be recyclable or reusable in the building’s renovation while others may need to be [&#8230;]</p>
The post <a href="https://simcatgroup.com.au/pre-demolition-audit-when-is-it-necessary/">Pre-Demolition Audit: When Is It Necessary?</a> first appeared on <a href="https://simcatgroup.com.au">Simcat Group Melbourne</a>.]]></description>
										<content:encoded><![CDATA[<p>A pre-demolition audit allows professionals to assess the non-hazardous materials that require removal from the structure and calculate their potential value. Some of these materials may be recyclable or reusable in the building’s renovation while others may need to be disposed in the appropriate fashion. Another purpose for this type of audit, though, is to identify hazardous materials in order to plan the necessary removal and disposal methods for them. Any partial or total demolition calls for one of these audits and certain types of internal strip-outs may also merit one. In addition, local building regulations can mandate the execution of these audits before the demolition can proceed. We listed five of the top benefits of performing pre-demolition audits in the following.</p>
<p><strong>Allows You to Assess Which Non-Harzardous Materials Are Reusable</strong></p>
<p>With the help of the pre-demolition audit, you can assess all the non-hazardous materials that you need to remove from your structure. Many times, these materials are reusable or at least, recyclable. As a result, they should not be disposed of in a landfill.</p>
<p><strong>Identifies All Hazardous Materials</strong></p>
<p>An audit prior to a demolition also discovers any hazardous materials that may require special removal and disposal methods. Asbestos is just one example of these materials.</p>
<p><strong>Helps You Comply with Regulations<br />
</strong><br />
Local authorities may require that a pre-demolition audit be performed before a demolition or an interior strip-out can proceed. Failure to comply with this regulation can delay your projects.</p>
<p><strong>Reduces Waste</strong></p>
<p>Since this type of audit allows you to analyse which materials are reusable or recyclable, it helps reduce the waste that your demolition produces. In this day of conservation efforts, this makes the audit an eco-friendly step to take with all demolitions and interior strip-outs.</p>
<p><strong>Lowers the Cost of Demolition in Some Cases</strong></p>
<p>Due to the fact that you can earn money on many, if not all, of the recyclables, you lower the cost of the interior strip-out or demolition by performing this audit. As a result, your project will put less of a strain on your budget.</p>
<p><strong>Performing a Pre-Demolition Audit Helps You Organise Your Project Efficiently</strong></p>
<p>One benefit of performing this type of audit that is overlooked many times is the fact that it helps you organise your project more effectively and efficiently. It allows you to make plans for unexpected issues, especially when it comes to hazardous materials.</p>
<p>For additional information about a pre-demolition audit and when to perform one, consult with Simcat Demolitions. We have the expertise to not only perform this type of audit but also all forms of demolitions and interior strip-outs. Our company delivers only high-quality results.</p>The post <a href="https://simcatgroup.com.au/pre-demolition-audit-when-is-it-necessary/">Pre-Demolition Audit: When Is It Necessary?</a> first appeared on <a href="https://simcatgroup.com.au">Simcat Group Melbourne</a>.]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Demolition vs. Deconstruction: Are There Differences?</title>
		<link>https://simcatgroup.com.au/demolition-vs-deconstruction-are-there-differences/</link>
		
		<dc:creator><![CDATA[Netwizard SEO]]></dc:creator>
		<pubDate>Thu, 18 Apr 2019 01:17:53 +0000</pubDate>
				<category><![CDATA[Blog]]></category>
		<category><![CDATA[Selective Demolition]]></category>
		<guid isPermaLink="false">https://simcatgroup.com.au/?p=430</guid>

					<description><![CDATA[<p>When property owners decide to remodel or rebuild their present home or building, they might need to remove the existing structure to proceed with their plans. While demolition seems to be the only course of action for this at first, [&#8230;]</p>
The post <a href="https://simcatgroup.com.au/demolition-vs-deconstruction-are-there-differences/">Demolition vs. Deconstruction: Are There Differences?</a> first appeared on <a href="https://simcatgroup.com.au">Simcat Group Melbourne</a>.]]></description>
										<content:encoded><![CDATA[<p>When property owners decide to remodel or rebuild their present home or building, they might need to remove the existing structure to proceed with their plans. While demolition seems to be the only course of action for this at first, closer research shows that there may be another viable option, namely deconstruction. Each one removes a structure effectively, but there are differences between their processes that you should understand before you are faced with which one to use with your own structure. For this reason, we explore both methods for structure removal in the following.</p>
<p><strong>What Is Demolition?</strong></p>
<p>Demolition is when you remove all of the furnishings from the structure, disconnect the utilities and knock the structure down using a wrecking ball or other equipment. The process leaves a pile of rubble and waste that is hauled away to a landfill for disposal. Very little, if any, of the debris is recycled.<br />
<strong><br />
What Is Deconstruction?</strong></p>
<p>Deconstruction involves taking the structure apart in a time-consuming, labour-intensive fashion. Crews systematically remove all construction materials intact. They also will separate these materials into their specific categories for recycling or reuse. Through the deconstruction process, about 80 percent of the waste is salvageable and sometimes more. Depending upon the nature of the materials, some of it may even be sold to recyclers, and this can reduce the cost of deconstruction.</p>
<p><strong>How to Tell Which Process Is Right for Your Needs</strong></p>
<p>If a structure is an unstable condition, demolition may be the safest way to remove all of it from the site, regardless of how the debris is disposed afterwards. An example of this is when a structure suffers irreparable damage during a storm. The age of a structure may also have a bearing on whether this is the right removal method for it.</p>
<p>When a structure is sound and contains reusable or recyclable materials, though, deconstruction is an environmentally responsible way to remove it. In addition, it can be cost-effective since you may be able to sell the recyclables to a recycler. Steel and other metals are examples of these items. Timber and stone elements are reusable in your own renovation project, which saves you money on new materials. Another benefit of deconstruction is that you can preserve favourite features, such as a carved mantelpiece or the timber paneling just for two examples.</p>
<p>For further details about the differences between demolition and deconstruction, consult with Simcat Demolitions. We will fully analyse your specific situation and advise you about which one is correct for your needs. Our company is highly skilled in the partial and full removal of structures and guarantees expert results.</p>The post <a href="https://simcatgroup.com.au/demolition-vs-deconstruction-are-there-differences/">Demolition vs. Deconstruction: Are There Differences?</a> first appeared on <a href="https://simcatgroup.com.au">Simcat Group Melbourne</a>.]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Pre-Demolition Inspection: What are the Most Important Factors to Consider?</title>
		<link>https://simcatgroup.com.au/pre-demolition-inspection-what-are-the-most-important-factors-to-consider/</link>
		
		<dc:creator><![CDATA[Netwizard SEO]]></dc:creator>
		<pubDate>Tue, 04 Dec 2018 01:43:37 +0000</pubDate>
				<category><![CDATA[Blog]]></category>
		<category><![CDATA[Selective Demolition]]></category>
		<guid isPermaLink="false">https://simcatgroup.com.au/?p=288</guid>

					<description><![CDATA[<p>Pre-demolition inspections take many shapes. There are papers and permits to fill, blank forms to fill in, and checklists to complete. Filling in the checklist, the foreman-in-charge is keeping the work personnel and the local community safe, assuming the project [&#8230;]</p>
The post <a href="https://simcatgroup.com.au/pre-demolition-inspection-what-are-the-most-important-factors-to-consider/">Pre-Demolition Inspection: What are the Most Important Factors to Consider?</a> first appeared on <a href="https://simcatgroup.com.au">Simcat Group Melbourne</a>.]]></description>
										<content:encoded><![CDATA[<p>Pre-demolition inspections take many shapes. There are papers and permits to fill, blank forms to fill in, and checklists to complete. Filling in the checklist, the foreman-in-charge is keeping the work personnel and the local community safe, assuming the project is located in a city, of course. There are danger signs to post, fences to erect, entrances and windows to board. Without further ado, let&#8217;s start with hazardous materials.</p>
<p><strong>Eliminate Hazardous Materials</strong></p>
<p>Asbestos is our first thought. Is there any asbestos on site? Following all relevant safety guidelines, hazardous materials are eliminated. Use an approved asbestos removal procedure.</p>
<p><strong>Safely Isolate Power and Fuel Services</strong></p>
<p>Turn off the electricity and gas, that&#8217;s the gist of this checklist entry. Fuel sources are cut, fuels and chemicals removed, and active plumbing services are disconnected. If an operational structure is still connected to those lines, other measures must be applied. Temporary branching lines and plugging connections are recommended when occupied structures are impacted by a services disconnection phase.</p>
<p><strong>Carry Out a Pre-Demolition Walkthrough</strong></p>
<p>The permits are piling up on the foreman&#8217;s desk, but he can&#8217;t allow himself to get tied down by mounds of paperwork. Coming out from behind this overburdened workspace, the foreman and inspection team pick up their clipboards and head for the demolition site. They take note of danger signs, security measures, safely disconnected services, and potential environmental hazards.</p>
<p><strong>Assigning Engineer-Oriented Tasks</strong></p>
<p>There&#8217;s more to the project than meets the eye. Below the floor, there are basement walls and load-bearing surfaces to map out on a demolition chart. If there are drainage systems down there, they need to be protected from falling bricks, which could clog an entire network, block-wide. Demolition sequences are next on the agenda, so there are hard choices to be made. Are there explosive charges to install? Does an adjacent property have a safety buffer? If the project is particularly difficult, a structural engineer can be recruited to mark off certain hazardous zones or to recommend wall shoring.</p>
<p>Structural damage can occur as demolition services get going. Perhaps it&#8217;s an old building, a site that&#8217;s about to be renovated. If the aging walls and supports are about to fail, it&#8217;s not a safe site to work inside. Demolition professionals keep a tight rein on such hazards. To combat their effects, temporary supports and scaffolds are installed. For walls, shoring is recommended. Demolition strategies take care of all such matters, thankfully. Armed with this plan, the team sequentially demolishes the target structure or a section of that structure. Hazardous materials, disconnected services and structural solutions, they all get their inked check marks, and then the project permits flow.</p>The post <a href="https://simcatgroup.com.au/pre-demolition-inspection-what-are-the-most-important-factors-to-consider/">Pre-Demolition Inspection: What are the Most Important Factors to Consider?</a> first appeared on <a href="https://simcatgroup.com.au">Simcat Group Melbourne</a>.]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Partial and Specialised Demolition Work: The Dangers When This Is Not Done Correctly</title>
		<link>https://simcatgroup.com.au/partial-and-specialised-demolition-work-the-dangers-when-this-is-not-done-correctly/</link>
		
		<dc:creator><![CDATA[Netwizard SEO]]></dc:creator>
		<pubDate>Tue, 16 Oct 2018 06:27:28 +0000</pubDate>
				<category><![CDATA[Blog]]></category>
		<category><![CDATA[Commercial Demolition]]></category>
		<category><![CDATA[Partial Demolition]]></category>
		<category><![CDATA[Selective Demolition]]></category>
		<guid isPermaLink="false">https://simcatgroup.com.au/?p=272</guid>

					<description><![CDATA[<p>Demolition is the act of deconstructing part or all of a structure in order to prepare the site for a new project. While you can well imagine the dangers associated with a full demolition, a partial and specialised demolition also [&#8230;]</p>
The post <a href="https://simcatgroup.com.au/partial-and-specialised-demolition-work-the-dangers-when-this-is-not-done-correctly/">Partial and Specialised Demolition Work: The Dangers When This Is Not Done Correctly</a> first appeared on <a href="https://simcatgroup.com.au">Simcat Group Melbourne</a>.]]></description>
										<content:encoded><![CDATA[<p>Demolition is the act of deconstructing part or all of a structure in order to prepare the site for a new project. While you can well imagine the dangers associated with a full demolition, a partial and specialised demolition also carries its own dangers or hazards when it is not done correctly. There are obvious dangers such as cave-ins and the less obvious ones, such as hidden asbestos and other harmful materials just for some examples. Also, workers can become injured for falling objects when they are not sufficiently protected on the job.</p>
<p><strong>Types of Hazards with Improperly Performed Partial and Specialised Demolitions</strong></p>
<ul>
<li>Workers falling from heights happen more often than one may imagine. Improper safety equipment is often at blame for this, but it can also happen when there are several crews working at once without clearly communicating with each other.</li>
<li>Remaining parts of the structure can collapse without the correct temporary supports put into place.</li>
<li>Falling objects can injure workers and pedestrians when there is not covered scaffolding to protect them. Often, people think scaffolding only helps the workers reach the proper heights to perform their jobs, but it also can be erected with a roof of sorts to protect those who must traverse certain pathways either to perform their jobs or just walk down the street in front of the building or structure.</li>
<li>When the gas, fuel or electricity supply lines have not been properly shut off, workers can suffer burns, respiratory problems and shock along with their being a high risk of fire. Also, refrigerant and water lines can cause other issues if they are not cut off prior to the demolition.</li>
<li>Rodent or other pest infestations can be hidden in the ceilings and walls. Not only can the pests bite the workers and possibly infect them with rabies, depending upon their species, but they leave faecal matter in the area that pose a health risk.</li>
<li>Mould growth, asbestos or other toxic substances can cause respiratory issues that range from mild breathing problems to severe diseases, such as cancer.<br />
<strong><br />
Ways to Avoid the Dangers in Partial and Specialised Demolition Work</strong></li>
</ul>
<p>In-depth planning is one of the ways to avoid most of the above dangers. When the demolition company researches the demolition site for the possible hazards, they can take steps to prevent many injuries and other issues. Also, ongoing training for the demolition workers is another effective measure.</p>
<p>For further details about the dangers when partial and specialised demolition work is not properly performed, consult with our company, Simcat Demolitions. We specialise in all types of demolitions from partial and specialised ones to full demolitions. Also, we serve both commercial and residential clients.</p>The post <a href="https://simcatgroup.com.au/partial-and-specialised-demolition-work-the-dangers-when-this-is-not-done-correctly/">Partial and Specialised Demolition Work: The Dangers When This Is Not Done Correctly</a> first appeared on <a href="https://simcatgroup.com.au">Simcat Group Melbourne</a>.]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Demolition Control Process Checklist: Why is this Important in Every Demolition Job?</title>
		<link>https://simcatgroup.com.au/demolition-control-process-checklist-why-is-this-important-in-every-demolition-job/</link>
		
		<dc:creator><![CDATA[Netwizard SEO]]></dc:creator>
		<pubDate>Wed, 28 Feb 2018 06:34:57 +0000</pubDate>
				<category><![CDATA[Blog]]></category>
		<category><![CDATA[Commercial Demolition]]></category>
		<category><![CDATA[Selective Demolition]]></category>
		<guid isPermaLink="false">https://simcatgroup.com.au/?p=222</guid>

					<description><![CDATA[<p>Mistakes happen in everyday life. Having said that, there are situations that simply cannot afford a mistake. By way of illustration, think about demolition. If there&#8217;s a misstep here, then lives are at risk. What&#8217;s called for here is a [&#8230;]</p>
The post <a href="https://simcatgroup.com.au/demolition-control-process-checklist-why-is-this-important-in-every-demolition-job/">Demolition Control Process Checklist: Why is this Important in Every Demolition Job?</a> first appeared on <a href="https://simcatgroup.com.au">Simcat Group Melbourne</a>.]]></description>
										<content:encoded><![CDATA[<p>Mistakes happen in everyday life. Having said that, there are situations that simply cannot afford a mistake. By way of illustration, think about demolition. If there&#8217;s a misstep here, then lives are at risk. What&#8217;s called for here is a checklist, a way of injecting procedural integrity into the process. Duly utilized, every stage of the demolition operation receives equal attention. Let&#8217;s start with the paperwork.</p>
<p><strong>Checklist Beginnings: Forming the Foundations</strong><strong> </strong></p>
<p>Like the ground level of a new structure, the top section of the checklist assembles the paperwork. Permits are obtained first, perhaps from a local council. The goal is to safely prepare the site. Further down the checklist, are all building services disconnected? Live electrical cables must be depowered, then they&#8217;re checked off with a tick on the document. It&#8217;s the same with the incoming gas lines. Turn off the gas and add another check to the list.</p>
<p><strong>A Communications Supporter</strong><strong> </strong></p>
<p>As demonstrated in the above passage of text, that checklist organizes the whole project. A site foreman might be absent-minded, but that&#8217;s not going to matter, not if there&#8217;s a copy of the checklist in his hand. That&#8217;s the main role of this working document, to systematically coordinate every step of the demolition process. Then, used as an actionable log, the recorded information is entered into the project report. Used like this, a demolition checklist becomes a formal paper, one that itemizes the steps taken by the on-site work team and any related off-site personnel.</p>
<p><strong>Demolition Control Process Checklists</strong><strong> </strong></p>
<p>Enough with the auditing and paperwork, we&#8217;re getting back to the heart of the matter. Before the permits, before the work grind even commences, there are more steps to be taken. For starters, this is an unsafe area. Safety notices should be erected so that people know the structure is marked for demolition. A No Trespassing sign will warn squatters and stop unruly kids. And it will also provide the demolition service with liability protection.</p>
<p>Intended as a two-way measure, demolition control process checklists impart systemized order into this hazard-prone field. Every conceivable step, from permit to ground clearance, is duly defined within the paper. Following on from that approach, instead of a carelessly scribbled note, the list is a formally recorded document. It affirms each stage of the work, ensures those stages are carried out in the right order, and it generates a record of the service, as conducted by a competent party. Checklists are important. In the demolition industry, carefully rendered checklists save lives.</p>The post <a href="https://simcatgroup.com.au/demolition-control-process-checklist-why-is-this-important-in-every-demolition-job/">Demolition Control Process Checklist: Why is this Important in Every Demolition Job?</a> first appeared on <a href="https://simcatgroup.com.au">Simcat Group Melbourne</a>.]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
