Call us 1300 SIMCAT
(1300 746 228)

Fragmented Demolition Solutions: Do’s and Don’ts to Ensure Safe and Hassle-Free Projects

November 5, 2021

Fragmented demolition projects should be easier to carry out than a full-on demolition. All things considered, there are fewer materials to break down and remove when the work calls for a fragmentedly rendered service, right? That is not necessarily true. Think of the actions that are being taken in this job. It’s a fragmented approach, and there’s an interface or buffer between the demolished section and the untouched region.

What You Need to Know About Fragmented Demolition Projects?

In this hypothetical project, one side of a structure has been entirely gutted. The opposing side is still functional and it will be renovated by a different contractor, maybe months from now. With walls and load-bearing pillars removed, the gutted section is being affected by the untouched structural elements. To counter those forces, the demolition service erects a series of wall buttressing supports. Without this temporary section buffering solution, the various-condition structural fragments could topple over or crumble.

Compensating For Sectional Shortcomings

In truth, this is a more complicated job. One part of a structure is disconnected according to one definition of a demolition contractor’s deconstruction handbook. Meanwhile, another section is classified as intact. The gas lines and electrical conduits cannot entirely be pulled, not yet at any rate. Fuses and circuit breakers need to be disconnected and labelled. In an entire demolition work, that whole switchboard would come out. In fragmented demolition work, it is easy to pull the wrong fuse, disconnect the wrong gas line, or isolate a service that’s still required in at least part of the building. The contractor might end up calling out an electrician, for someone needs to put in a temporary power supply until something more permanent solution can be done to safely split the various services.

Sealing Failures Should Never Happen

There will be an exposed wall filled with asbestos in the deconstructed section. It must be necessarily sealed off, so the vents to the other side of the edifice require attention. Rats and other vermin take up residence in the torn down sections. The building, fragmentedly demolished or not, needs to be boarded up and shuttered. Vermin traps should be laid. That’s an approach that applies to mould growths, rain and other environmental elements, and to the occasional homeless person who sees the demolished area as a temporary home.

Essentially, casual observers don’t have any trouble telling the difference between the fragmented sections of a demolished structure. What they do have trouble with is seeing the buffers between areas. Shuttered doorways and boarded-up passages are easy enough to install, but what about vents and structural elements? The vent system needs separating so that vermin and mould cannot spread. As for the structure, a temporary support system must be installed if any load-supporting walls or pillars are removed.

SIMCAT has established itself as a leader of the demolition works all over Melbourne, specialising in large and small demolition, domestic and commercial sites, asbestos and hazardous waste management. Our professional and experienced team members are all accredited with relevant industry certifications, providing a premium service to contractors and homeowners all over the Melbourne area.

Optimized by: Netwizard SEO